沼氣發電機組組成分析及應用發電條件
1、沼氣脫硫及穩壓、防爆設備:供發起機運用的沼氣要先通過脫硫設備,以削減硫化氫對發起機的腐蝕。沼氣進氣管路上設備穩壓設備,以便于對流量進行調理,到達更佳的空燃比。別的,為避免進氣管回火,應在沼氣總管上安頓防回火與防爆設備。
1. Methane desulfurization, stabilization, and explosion-proof equipment: The biogas used for the initiator must first pass through the desulfurization equipment to reduce the corrosion of hydrogen sulfide on the initiator. A pressure stabilizing device is installed on the biogas intake pipeline to facilitate flow regulation and achieve a better air-fuel ratio. In addition, to avoid backfire in the intake pipe, anti backfire and explosion-proof equipment should be installed on the biogas main pipe.
2、進氣調理體系:在進氣總管上,需設置一套準確、活絡的燃氣混合器,以調理空氣和沼氣的混合份額。
2. Air intake conditioning system: An accurate and flexible gas mixer needs to be installed on the intake manifold to regulate the mixing ratio of air and biogas.
3、發起機焚燒體系:沼氣的焚燒速度慢,關于本來燃氣發電機組運用汽油、柴油已及天然氣的發起機的焚燒體系要進行必定程度的改造,以進步焚燒功率,削減后焚燒表象,延伸工作壽數。
3. Incineration system of the initiator: The incineration speed of biogas is slow. The incineration system of the initiator, which originally used gasoline, diesel, and natural gas in gas generator sets, needs to be modified to a certain extent to improve incineration power, reduce the appearance of post incineration, and extend working life.
4、調速體系:若沼氣發電機組獨立工作,即以用電設備為負荷進行工作,用電設備的并入和卸載都會使發電機的負荷發生動搖。為了保證發電機組正常工作,沼氣發起機上的調速體系必不可少。
4. Speed regulation system: If the biogas generator unit operates independently, that is, working with the electrical equipment as the load, the integration and unloading of the electrical equipment will cause the load of the generator to fluctuate. In order to ensure the normal operation of the generator set, the speed control system on the biogas generator is essential.
5、預熱運用體系:選用預熱運用設備,對發起機冷卻水和排氣中的熱量進行運用,進步沼氣的動力運用功率。
5. Preheating application system: Select preheating application equipment to apply the heat in the cooling water and exhaust of the generator, and improve the power utilization of biogas.
6、并網控制體系:首要包含發電機調壓電路,主動準同期并排控制電路,手動并排寬沼氣發電機組和列控制電路,丈量電路,燃氣發起機及輔佐設備控制電路等。
6. Grid connected control system: mainly includes generator voltage regulation circuit, active quasi synchronous parallel control circuit, manual parallel wide biogas generator set and column control circuit, measurement circuit, gas initiator and auxiliary equipment control circuit, etc.
本文由蘭炭煤氣發電機組提供幫助,更多的相關內容請點擊: http://www.ptvydps.cn 希望本文能夠為您帶來幫助,感謝您的閱讀!
This article is provided by the Lanzhou Coal Gas Generator Set for assistance. For more related content, please click: http://www.ptvydps.cn I hope this article can be helpful to you. Thank you for reading!
業務分類
Business classification產品推薦
product recommendation聯系方式
Contact Information截屏,微信識別二維碼