尼日爾AGADEM油田地面工程項目,油田采油動力電源。采用6臺1200kW天然氣發(fā)電機組,電壓10.5kV,以及一臺800kW,電壓10.5kV作為黑啟動電源。電站2010年開始運行,至今運行良好。
6×1200kw gas generator as main power + 1×800kW diesel generator for black start, in desert
area, Niger. Commissioning and Operating began in 2010. Till now the power plant runs well.